The SR 0308 Section 255 West Sunbury Bridge project over Muddy Creek in Clay Township, Butler County, involves replacing an existing structurally deficient single-span bridge with a precast concrete box culvert. NTM, as prime consultant, is performing the structural design, roadway design, H&H analyses, erosion and sedimentation control design, and permitting for the replacement structure. […]
SR 0308 Section 255 West Sunbury Bridge over Muddy Creek
Client: PennDOT District 10-0Location: Butler County, PA